Explore Other Data Centres:

Washington DC Data Centre

Commitment to Compliance

Cyxtera is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

Washington DC Area Data Centres: Supporting Global Connections

Washington DC is home to Fortune 500 companies and some of the most important financial institutions in the world. It also hosts the largest IP peering connection point in North America.

Six of the footprint of 60+ Cyxtera data centres are located in metro Washington DC. Combined, the Washington DC data centres supply 30,565.1 m² of premium co-location space that empowers this vital communications nucleus. Designed to meet strict networking and IT security demands of enterprise, government and financial institutions, the Washington DC data centres offer failsafe critical systems infrastructure, powerful cross connects, and multi-tier security measures that can be augmented for specific security requirements. From these facilities, technology connects markets across the globe.

Announcements

Take a Virtual Tour of the CH3 Data Centre

Data Centres

Washington DC Data Centre Locations

Locations

DC2: Sterling, VA

Space: 8,220.897 m²   Power: 6 MW

Tech Specs

DC2: Sterling, VA     Space: 8,220.897 m²     Power: 6 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior (sf) = 88,489
  • Raised floor (inches) = 12

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

DC3: Sterling, VA

Space: 7,308.775 m²   Power: 8 MW

Tech Specs

DC3: Sterling     Space: 7,308.775 m²     Power: 8 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior(sf) = 78,671
  • Raised floor (inches) = 24

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1 + 1
  • Total Power Capacity = 8 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

DC4: Sterling, VA

Space: 12,589.57 m²   Power: 12 MW

Tech Specs

DC4: Sterling     Space: 12,589.57 m²     Power: 12 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior (sf) = 135,513
  • Raised floor (inches) = 30

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1 + 1
  • Total Power Capacity = 12 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

DC5: Sterling, VA

Space: 4,413.638 m²   Power: 3.2 MW

Tech Specs

DC5: Sterling     Space: 4,413.638 m²     Power: 3.2 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior (sf) = 47,508
  • Raised floor (inches) = 24

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 3.2 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

DC6: Sterling, VA

Space: 6,599.182 m²   Power: 13.6 MW

Tech Specs

DC6: Sterling     Space: 6,599.182 m²     Power: 13.6 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior (sf) = 71,033
  • Raised floor (inches) = 24

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 13.6 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

DC7: Sterling, VA

Space: 12,564.486 m²   Power: 4.8 MW

Tech Specs

DC7: Sterling     Space: 12,564.486 m²     Power: 13.6 MW

Real Estate Summary

  • Located near Dulles International and Reagan National Airports; 40 minutes from Washington, D.C.
  • One story building
  • Total building interior (sf) = 135,243
  • Raised floor (inches) = 36

Electrical Summary

  • Dominion Virginia Power provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 4.8 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

More Locations

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

Innovations in Data Centre Connectivity

Michael Levy | April 18,2017

Many businesses must avail themselves of the latest technology to remain competitive in their industry. For instance, many car manufacturers now include backup cameras, Bluetooth and GPS capabilities and in-car Wi-Fi in their newer models. Newer vehicles without those technologies … Read more…→ The post Innovations in Data Centre Connectivity appeared first on CenturyLink EpiCenter Blog.

Business Continuity Planning: The Distributed Data Centre Approach (Part Two)

Chip Freund | April 05,2017

As I discussed in my most recent blog, some companies utilize a distributed data centre approach to achieve redundancy, scalability and high availability as part of their plan for business continuity. It enables businesses to help mitigate disasters that can … Read more…→ The post Business Continuity Planning: The Distributed Data Centre Approach (Part Two) appeared first on CenturyLink EpiCenter Blog.

Data Centre World Global - Unleashing the Power of Co-Location

David Murphy | April 03,2017

The greatest ideas - the most impactful innovations - come from recognizing an opportunity and then trying new approaches. As I look forward to the Data Centre World Global meeting to be held in Los Angeles, I think about what … Read more…→ The post Data Centre World Global - Unleashing the Power of Co-Location appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Call Us

Call Us

SALES: +852 2190 8798
SUPPORT: +65 6768 8099

Get Connected. See What's Next for Business.
CenturyLink has sold its data centres and associated co-location business to a consortium led by BC Partners and Medina Capital Advisors. This move led to the creation of a bold, new company, Cyxtera Technologies, comprised of world-class talent and technology. CenturyLink will continue to work closely with Cyxtera and the same strong team that has operated the data centres successfully for years and who will continue to deliver world-class customer service and Operational Excellence for all co-location customers.