Explore Other Data Centres:

New York & New Jersey Data Centres

Commitment to Compliance

Cyxtera is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

Ultra-Low Latency Co-Location, Proximity Hosting and Network Connectivity

Throughout the footprint of 60+ Cyxtera data centres around the globe, fast-moving technology greatly impacts the economy.

Cyxtera's six New York/New Jersey data centres offer ultra-low latency co-location, proximity hosting and network connectivity to key financial markets venues and trading participants. A dedicated Financial Services sales and support team within each data centre manages every component of data with powerful cross connects and financial grade multi-tier security measures. The strategically located New York/New Jersey data centres support:

  • One of the top three major US equities exchanges' matching engines
  • Matching engines for three of the five largest US equity dark pools, representing approximately 47% of average daily volume traded in US equities dark pools
  • Connectivity to all key U.S. markets < 200 microseconds (one way latency)
  • A broad range of alternative trading venues and solutions providers, covering multiple asset classes
  • All of Fortune's top 14 Securities Firms, 10 of Fortune's top 13 Diversified Financials, and 10 of Fortune's top 17 Financial Data Services
Announcements

Take a Virtual Tour of the CH3 Data Centre

Data Centres

NY & NJ Data Centre Locations

Locations

NJ1: Jersey City, NJ

Space: 74,222 s   Power: 3.4 MW

Tech Specs

NJ1: Jersey City     Space: 74,222 sf     Power: 3.4 MW

Real Estate Summary

  • Located near International Airport; 15 minutes from Manhattan, NY
  • Ten story building
  • Total building interior (sf) = 74,222
  • Raised floor (inches) = 12

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 3.4 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • FM200

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

NJ2: Weehawken, NJ

Space: 20,719.422 m²   Power: 16MW

Tech Specs

NJ2: Weehawken     Space: 20,719.422 m²     Power: 16 MW

Real Estate Summary

  • Located near Newark International Airport; 15 minutes from Manhattan, NY
  • Four story building
  • Total building interior(sf) = 223,022
  • Raised floor (inches) = 12

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 16 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • FM200

Mechanical Summary

  • Cooling system configuration = N+1
  • Temperature and humidity managed to strict ASHRAE standard

NJ2X: Weehawken, NJ

Space: 19,438.753 m²   Power: 12 MW

Tech Specs

NJ2X: Weehawken     Space: 209,237     Power: 12 MW

Real Estate Summary

  • Located near Newark International Airport; 15 minutes from Manhattan, NY
  • Five story building
  • Total building interior (sf) = 209,237
  • Raised floor (inches) = 24

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 12 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N+1
  • Temperature and humidity managed to strict ASHRAE standard

NJ3: Piscataway, NJ

Space: 12,490.814 m²   Power: 12 MW

Tech Specs

NJ3: Pisataway     Space: 134,450 s     Power: 12 MW

Real Estate Summary

  • Located near Newark International Airport; 15 minutes from Manhattan, NY
  • Three story building
  • Total building interior (sf) = 134,450
  • Raised floor (inches) = 30

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 12 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N+20%
  • Temperature and humidity managed to strict ASHRAE standard

NJ4: Piscataway, NJ

Space: 7,754.245 m²   Power: 6 MW

Tech Specs

NJ4: Piscataway     Space: 7,754.245 m²     Power: 6 MW

Real Estate Summary

  • Located near Newark International Airport; 45 minutes from Piscataway, NJ
  • One story building
  • Total building interior (sf) = 83,466
  • Raised floor (inches) = 36

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 6 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N+20%
  • Temperature and humidity managed to strict ASHRAE standard

NJ5: Newark, NJ

Space: 7,246.437 m²   Power: 5.3 MW

Tech Specs

NJ5: Newark     Space: 7,246.437 m²     Power: 5.3 MW

Real Estate Summary

  • Located near Newark International Airport; 15 minutes from Manhattan, NY
  • Fourteen story building
  • Total building interior (sf) = 78,000
  • Raised floor (inches) = 24

Electrical Summary

  • PSE&G provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N+1
  • Total Power Capacity = 5.3 MW
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N+20%
  • Temperature and humidity managed to strict ASHRAE standard

More Locations

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started

SALES: +852 2190 8798
SUPPORT: +65 6768 8099

Get Connected. See What's Next for Business.
CenturyLink has sold its data centres and associated co-location business to a consortium led by BC Partners and Medina Capital Advisors. This move led to the creation of a bold, new company, Cyxtera Technologies, comprised of world-class talent and technology. CenturyLink will continue to work closely with Cyxtera and the same strong team that has operated the data centres successfully for years and who will continue to deliver world-class customer service and Operational Excellence for all co-location customers.